Provo Reservoir Canal Enclosure

Project Owner: Provo River Water Users. Association & Bureau of Reclamation

Project Specifications:

  • Complete enclosure of the open canal
  • 21 miles long, carries water from the mouth of Provo Canyon to the Point of the Mountain
  • Installation of 126 inch pipeline
  • Each section of pipe is 10 feet long
  • Canal became a non-motorized trail for joggers, bicyclists and equestrian use.

Key Services Provided by PEPG:

  • Geotechnical and construction engineering solutions
  • Trench excavation support
  • Geotechnical engineering and design at various main utility crossings
  • Materials evaluation and hydraulic engineering for the I-15 Siphon
  • Soil diversion plans for the American Fork River, Bull River Ditch, and other emergency overflows

FHWA Goosberry Road Improvements

Project Owner: FHWA Central Federal Lands Highway Division

Project Specifications:

  • 7 mile road located in the Fish Lake National Forest in Sevier County, Utah
  • Re-aligning specific segments, widening the right-of-way
  • Constructing or improving culvert crossings, installing blanket drains, and constructing ull out areas
  • Located in a topographically diverse area with steep slopes and elevations over 10,000 ft.

Key Services Provided by PEPG:

  • Coordination
  • Construction Staking
  • Value Engineering & Design

The Cliffs of Snow Canyon

Project Owner: Snow Canyon Development

Project Specifications:

  • 200 Unit Residential and recreation community that encompasses 100 acres
  • 60% consists of single family housing
  • Common recreation area containing tennis courts, pool, spa and clubhouse
  • Located in an extremely science and environmentally sensitive area sharing boundaries with both Snow Canyon Stake Park and the Tortoise Reserve.

Key Services Provided by PEPG:

  • Boundary and topographic surveying and mapping of site
  • Hydrologic analysis
  • Development engineering and mitigation
  • Providing permitting services
  • Construction staking
  • Platting

Wolf Creek Ranches

Project Owner: Snow Canyon Development

Project Specifications:

Gated community at an average elevation of 8,000 feet

  • 14,000 acres under greenbelt status and adjoins about 2.2 million acres of forestland
  • 84 lots each of 160 acres or more
  • 28 stall equestrian center with outbuildings, a guard house, a guest house, an owner’s lodge and heliport
  • 50 miles of mix-used trails, 27 miles of roadway
  • Several fishing ponds, a centralized water system, and underground utilities system and a buried fiber optic phone line system

Key Services Provided by PEPG:

  • Full engineering services
  • Road design
  • Storm water system modeling and design
  • Cadastral boundary and topographical surveys and construction staking

The Meadows

Project Owner: Woodbury Corporation

Project Specifications:

210 acre commercial development located in Utah County

  • Development consisted of several large retail sites including:
  • Walmart
  • Home Depot
  • Best Buy
  • Kohl’s
  • Cinemark Theater

Key Services Provided by PEPG:

  • Initial wetland and environmental studies of original site working with the Army Corp of Engineers
  • Survey services including initial boundary and ALTA surveys, easement and right of way preparation, utility location, topographical surveys and construction staking
  • Assisted client with master planning of overall project
  • Designed all of the infrastructure and utilities in the entire center, including water, sewer, storm drain, city roadways, bridges and state road improvements
  • Civil engineering for the majority of the individual commercial pad sites

UDOT 11400 South Road Improvements

Project Owner: Utah Department of Transportation

Project Specifications:

4.5 miles of roadway and an interchange with I-15

  • 5 box culverts replaced or extended
  • Widening of I-15
  • 3 new bridges
  • Massive settlement sites

Key Services Provided by PEPG:

  • Construction Surveying and Pre-construction Surveys in adjacent homes
  • Permitting and Hydraulic Engineering to design a bypass channel for the Jordan River crossing and water line construction
  • Detailed drawings and coordination with land owners and the taxing commission for the crusher site
  • Negotiated with land owners and found an on-site gravel pit and waste site, saving millions of dollars